on 06-14-2016 9:34 AM
After assigning batch to process order, when we want to goods reciept by movement type 101 in MIGO, "date of manufacture" field changes automatically with posting date. So the date of manufacture is changed after batch is created at GR time.
Maybe it is because of automatic batch creation in MIGO, when the batch was not created before, and the system creates the batch and fill date of manufacture field with posting date.
We need to this field copied from date of manufacture field in MSC1N.
Hi
Do you also have SLED active ? If so, check that the 'Total shelf life' field on the MMR Plant/Data 1 tab is blank. If populated, the system assumes that the GR data is the manufacturing date.
Cheers
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
In my system is the manufacturer date in an existing batch not changed at all
A second receipt of the same batch on another day will just fetch the existing information from the batch record and use this for posting.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.