Hi all,
Currently we are using PI 7.1 in my project.
Now we are going to upgrade the version.
Please let me know the activities I have to do in SAP ECC and SAP PI?
what are all the test cases I have to take?
Thanks In Advance,
Vishnu Vardhan.
Hi All,
Continue to the above.
Recently we have upgraded the SAP ECC system and integrated with SAP PI System.
what type of connections we need to test in that case?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Vishnu,
For SAP PI upgrade testing please refer the below blogs
for connectivity, please refer the below wiki
Connection Settings between ECC and PI system - Process Integration - SCN Wiki
and discussion - http://scn.sap.com/thread/2103134
regards,
Harish
Hi Vishnu,
To which PI version your upgrading PI ( Single or Dual ).
Two ways to upgrade PI
1. Upgrading existing system
2. Installing new system 7.4 or any versions and importing the existing system export
Thanks,
Karunakar M
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Vishnu,
Follow the below link you will come to know all instructions before upgrade.
http://help.sap.com/nw74 and follow the upgrade guides.
Thanks,
Karunakar M
User | Count |
---|---|
85 | |
10 | |
10 | |
9 | |
7 | |
6 | |
5 | |
5 | |
4 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.