on 05-26-2016 4:47 PM
Hello,
We have SLT replication scenario where we have to refresh Source/Target systems of Production to quality system. After the refresh we have to perform initial load and this is causing delay in project testing as initial load for big tables takes very long.
Architecture Setup:
Production:
Source system SID PRD
SLT System : PT1
Tarrget HANA sidecar system SID : PR1
Quality:
Source system SID QRD
SLT System : QT1
Target HANA sidecar system SID : QR1
In this case QRD gets refreshed from PRD and QR1 gets refreshed from PR1. The backup is taken around same time to keep them as close as possible but not exactly at the same instance of time. QT1 is not involved in refresh.
We followed SCN http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/10c14106-564e-3310-cf86-be80a6c27...
but still it does not work and we still have to perform initial load.
Is there any additional step that needs to be performed for this to work?
Hi Khalid
Have a look at this one.
Regards
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
87 | |
10 | |
10 | |
10 | |
7 | |
6 | |
6 | |
5 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.