cancel
Showing results for 
Search instead for 
Did you mean: 

Scheduling of Individual tables

Former Member
0 Kudos

hello Experts,

I am loading data to HANA from Oracle using SLT, We have around 180 tables which have to be loaded daily twice at interval of 12 hours.


I have created single Schema and all the tables have been replicated and loaded, But when

there are delta loads lot of table status are in waiting stage. As the work process(SLT) in our system are 60

is it possible to schedule each Individual table under a Schema at different time interval.

Thanks & Regards

Kishore

Accepted Solutions (1)

Accepted Solutions (1)

former_member252769
Active Participant
0 Kudos

Hi Kishore,

Specific to table level is not possible, but u can create several configuration and then schedule it.

Hope it answers.

Regards

BJ

Former Member
0 Kudos

Hi BJ,

Thank you, we are planning to do the same

but wanted to find out if there is a work around.

Thanks & Regards,

Kishore

Answers (0)