on 05-26-2016 6:44 AM
hello Experts,
I am loading data to HANA from Oracle using SLT, We have around 180 tables which have to be loaded daily twice at interval of 12 hours.
I have created single Schema and all the tables have been replicated and loaded, But when
there are delta loads lot of table status are in waiting stage. As the work process(SLT) in our system are 60
is it possible to schedule each Individual table under a Schema at different time interval.
Thanks & Regards
Kishore
Hi Kishore,
Specific to table level is not possible, but u can create several configuration and then schedule it.
Hope it answers.
Regards
BJ
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
93 | |
10 | |
10 | |
9 | |
9 | |
7 | |
6 | |
5 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.