PDS lot size have conflict with manually created planned orders in SNP planning book:
1 The SNP PDS have fixed lot size transferred from PV.
2 The product have fixed lot size setting in the product view, the lot size value is the same with the PDS setting.
3 SNP heuristic planning do create SNP planned order with valid fixed lot size PDS.
4 Manually created planned order with multiple value of fixed lot size value do not have PDS selection screen popup, the planned order have no resource to select and remain blank, you have to maintain the related PDS in the detail view.
Here is the question:
what is the difference of the manually created and SNP heuristic planning logic?
What problem? Not sure I understand the issue.
The PDS is chosen regardless of lot size, depending upon engine.
The lot size from material master is used to determine the order size/quantity.
Manually creating orders do not need to respect lot sizes in APO or ECC.
Ken
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
in my problem, the source seletion do consider the lot size settings in the PDS.
1. in SNP heuristic planning, which means the demand tragger the planning process and the creation of related planned order, the PDS selected as normal.
2. If you manually create the multiple of the fixed lot size value, the PDS selection window will not show up and you have to maintain them in the detail view of the related order.
like: SNP PDS fixed lot size:7500
product master fixed lot size:7500
if I manually maintain the planner order value 15000, the PDS selection window will not show up, but if you maintain the value 7500, the PDS selection window will show up.
As I mentioned before and R Brahmankar confirmed, Manually creating orders do not need to respect any lot sizes. Why should it? You are manually creating the planned order. Why do you have a PDS with a fixed lot size. That makes no sense. That limits the use of the PDS to only orders of exact size of 7500. That is the purpose of the fixed lot size in material master.
Ken
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello,
Please refer SAP note 1170708 - Lot size not considered to find valid Sources of Supply
Best Regards,
R.Brahmankar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Raymond,
1.Can You check what is the lot size maintained against a material in ECC (OLTP) system.
2. Using tcode PDS_MAINT against a particular material try to find any inconsistencies.
Hope this clues will help you. Rewards are highly appreciated.
Regards
Arvind Pabba
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
more specifically question is: what is the difference of the PDS selection between manually created and the SNP heuristic planned orders.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
9 | |
4 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.