Work Step not reflecting in VAS work center

former_member804409
Participant
0 Kudos

Hi Guys,

I have configured VAS inbound Scenario.Pack spec does not have a packaging material but have added work steps.

In my VAS order pack spec is getting determined.But in VAS work center work steps are not showing up.Any check points what could be the issue here ?

Regards,

Khushboo

Accepted Solutions (1)

Accepted Solutions (1)

former_member183610
Active Contributor
0 Kudos

Hi Khushboo,

I have tested the same in my test system and work step is not shown in WC.As per my knowledge it would required to implement BADIs at WC layout level for detailed area.

For your reference, I am providing the screens.

BR,

C K Reddy

former_member804409
Participant
0 Kudos

Thankyou Mr Redyy,

Can you tell me how did you take print for this ?

Regards,

Khushboo

former_member183610
Active Contributor
0 Kudos

Hi,

Below is the process to get print preview of pack spec.ensure output device to get the preview.

BR,

C K Reddy

former_member804409
Participant
0 Kudos

Thankyou Mr Reddy,

Still confirming that Work step in work center is not a standard thing.Your answers helped me to move forward.

Regards,

Khushboo

Answers (2)

Answers (2)

jobi_t
Contributor
0 Kudos

Hi Khushboo

Maintain the posc step. It is missing the destination(work center) in posc.

Are you able to list out the work center in change mode of a vas order?

Regards

Jobi

former_member804409
Participant
0 Kudos

Hi Jobi,

Not sure by your comment maintain POSC setting.I am able to see my HU in VAS work center and also able to get a new task on closing HU.

Regards,

Khushboo

former_member183610
Active Contributor
0 Kudos

Hi,

Are you expecting the work step alone without any packaging materials at level type in pack spec for VAS order?

Can you share the screens of pack spec and VAS WC ?

BR,

C K REDDY

jobi_t
Contributor
0 Kudos

Yes, leave that point.

Can you check Level type of packspec customizng data? Inside level type you can place external step.

former_member804409
Participant
0 Kudos

Hi Jobi,

My level type has right external step assigned to it.

Regards,

Khushboo

former_member183610
Active Contributor
0 Kudos

Hi,

Did you maintain the VAS step in WC?

How did you maintain the POSC with work step, with destination storage type 'or' rule based?

If possible, please attach the screen?

BR,

C K REDFY

former_member804409
Participant
0 Kudos

Hello Mr Reddy,

Nothing is rule based here.Is there something in POSC step that relates to work step ?Can you specify exactly?

Regards,

Khushboo