on 05-06-2016 7:42 PM
Hi,
There is Manufacturing plant and DC.
T Lane exists between this two from Plant to DC.
There is demand sitting at DC and we run Heuristic at DC. This demand is not passing as requirement to Plant.
What could be the reason? Do I need to check some settings?
Regards,
Prabhat
Hi,
Is this problem in Production ?
I would advise to replicate in a lower environment & check.
There may be various reasons for this.
Are you having the correct settings for Heuristics ?
Check if you have stock for same at DC already ?