on 05-05-2016 8:45 PM
Hi,
Im testing a SM7.2 and I have some doubts regarding Documentation, actually I made a Clean Instalation of SM72 and I want to move 1 project to see how react in the new SM72 documentation schema.
On SM7.1 SOLAR_PROJECT_ADMIN I create a transport an put all the project information inside, I Imported the transport in SM72 (same process to move doc to SAP CAL) and now In the transaction PREPARE_ACTIVATION, I see my project but in step 2, I don't see any Logical component. 😞
I don't have the option to run the preparation_activation on the SM71 solman
thanks
Wence
Hello Wence,
As far I read you need to perform in-place upgrade to use any old data.
I am not sure about the way you are doing is possible or not. You might need to create OSS message and ask SAP Development team to look in to it.
I have done in-place upgrade and you can find documents as below .
Cheers,
Yogesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi all,
I solve my issue, the problem was a Transaction assigned in Solar02 to a logical component that was missing (deleted but never refreshed).
This situation was discover making a copy of the project (the system was unable to copy the specific Business step).
Now is working,
Thanks all,
@WenSolman
ps:remember, to copy for 4 tables and export the system from SLD before make the import of the project,