on 05-05-2016 4:23 PM
Hi all,
We are soon going to migrate from IBP 5.0 to 6.1 and we are trying to anticipate the efforts that this will require.
I wonder what are the impacts on HCI-DS :
Is it correct?
Thanks a lot,
Pierre
Hi Pierre,
Here is my feedback, after being involved in IBP migration from 4 to 6:
Good luck with the migration,
Alecsandra
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Alecsandra,
Thanks for your answer, it helps a lot!
How can you be sure that the Key figure tables will have the same names in IBP 5.0 and 6.1 ?
Their names are usually a concatenate of the source planning area and current planning area.
For example our table timeseries (target for Key figure) is called "SOPDD_STAGING_KFTAB_CONFIGPRODUCTION" ; because our PRODUCTION Planning Area is a copy of CONFIG planning area.
When we will re-create manually the PRODUCTION planning area in 6.1, we will create a copy of SAP4 and then add our specific attributes and key figures.
The name of the table timeseries will probably become something like : "SOPDD_STAGING_KFTAB_SAP4PRODUCTION".
Am I right ?
Thanks,
Pierre
Hi Pierre,
In our case it was an automatic process, so the same planning area structure was migrated to the new system. If you go for manual migration (the only one available now from IBP 5 to 6) and recreate from scratch, then yes, the kf table name will be different.
I don't know if it is possible to have a custom KF table name so that you would avoid the dataflow replication to new target...maybe someone from SAP support team can clarify.
Regards
Alecsandra
Hi,
What is the process to be followed to migrate the existing HCI jobs pointing to IBP5.0 to the new planning area in IBP6.1?
I am aware of the steps to migrate to a different planning area if the system is the same. We can do it by Copying the Subtask to a new target table. But this is not possible if I have to migrate to the new PA of new system since the target connection is still pointing to the old datastore and not available to edit.
Am I making clear?
Thanks,
Kiran
Hi Kiran,
You should be able to create a new Datastore configuration by clicking on the + from your Datastore configuration screen in HCI.
From there you will see new Instance / Tenant referring to IBP 6.1
Finally from System configuration on top of the screen, select the right Datastore with the new configuration. Import tables from 6.1 in your IBP Datastore copy Dataflow to new target and you should be fine
Thanks Julien,
I first created a new datastore configuration in my existing datastore by clicking the little Plus sign and pointed this to the new IBP instance.
Step 2: I went into the systems configuration tab and created a new configuration and pointed this to the new datastore configuration.
Now if I go back to my datastores tab, select the datastore and go into the tables tab --> Click on import. I am still seeing the planning areas from my old instance only.
Am I missing something?
Thanks,
Kiran
User | Count |
---|---|
7 | |
4 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.