Hello Guru's,
Can we restrict a resource capacity utilization based on material?
For Eg : Product A should only use 20% of capacity and product B uses 80% of the capacity.
Regards,
Nick
NO.. then it would basically be a resource per product.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello Ken,
what i was looking for is if we have a resource A is there any way I can restrict a product B to utilize no more that 50% capacity of resource A and product B can utilize the rest 50% .
Is this a possibility in APO like can we use anything like soft sequences or something ?? Thank you for your help
Regards,
Nick
Hi,
You can try the following steps:
1. Create 2 dummy resource.
2. define the capacity based on you requirement, let's say 20% for A and 80 % B. . But the 20% capacity of dummy resource 1 is 100% capacity of the main resource. Similar things for 2nd dummy resource.
3. Assign these dummy resources into their corresponding PPM, with fixed consumption. ( Here you need to do a bit tweaking wile defining the consumption)
4. Run the SNP engine.
SNP engine will consume the capacity both resource in the PPM ( Main and Dummy). As the dummy resource capacity is 20% of main resource, once the dummy resource is fully consumed the main resource will be consumed by 20%.
let me know for more clarification.
regards
Kishor
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
8 | |
3 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.