on 05-02-2016 4:04 AM
Hi Experts,
I have set a particular project profile planning method to open planning for both both basic and forecast. In addition, I have set scheduling scenario to free scheduling. Per other threads and available SAP guidance this can be changed at a project level from the project planning board by selecting options and scheduling tab. However, when I go to there, the fields are not available to do so. I am operating on ECC 6.0 / EHP 7. Can someone advise if this ability has been moved or taken away or if it's visibility is controlled by some additional configuration or through an OSS note?
Thank you,
Kevin
Hi Kevin,
you can change the settings in Project Builder as well.. I think your project structure should not be in released status..
Check on the Control Tab for these settings.. Similarly you can change it at PPB as well..
Regards
Sammar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
95 | |
11 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.