Hi SRM experts!

Currently we have SRM 5.0 and back end is 4.7 the scenario we are using is Extended Classic Scenario.

Now the back end is changing from 4.7 to ECC6.0

What are the changes need to be done apart from the RFC connection and distribution model.

Does any body has all the check list of the items if so please do share.

Thanks!

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

Hi

Please refer to these SAP OSS Notes as well.

<u>Note 550071 FAQ: EBP - Shopping Cart

815849 FAQ: Account assignment system response

999849 Several back ends have wrong follow-on document, same cat ID

995771 System Landscape Copy for SAP SRM 4.0 and 5.0

813733 SRM connection to an ERP 2004 (ERP 1.0) back end

679899 SAP R/3 4.70 (Enterprise) is not recognized as Backend</u>

<b>Other related links -></b>

Do let me know, incase still face any issues.

Regards

- Atul

yann_bouillut
Active Contributor
0 Kudos

Hi,

In "define backend system" , select "erp 2.0" for your ECC60 backend.

Kind regards,

Yann

Former Member
0 Kudos

Hi,

you have to change the logical system name in customizing and attributes - if you change the logical system of the backend.

Use transactions BDLS and BD54 for changing the system in the tables and report RHOMATTRIBUTES_REPLACE to change the system name in the attributes.

The document "Setup, transport and copy of SAP EBP Systems.pdf" provides an extended list of required system activities (chapter 12). It should be found in SAP Net. It refers to EBP 3.5 (SRM 2.0) but it should be valid for SRM 5.0, too.

Best regards,

Karsten