Hi guys,

We are in the process of Migrating an ERP 6 EHP7 System to S/4HANA 1511.

During SUM Phase whichs executes Pre-conversion checks I'm stuck with this error

I have applied all Notes mentioned in Note 2182725 - S4TC Delivery of the SAP S/4HANA System Conversion Checks.


SUM phase its showing the following error.

Error

SUM-Phase: PREP_EXTENSION/RUN_S4H_PRE_CHECK_CONS

ERROR: Errors occurred during Execution of S4Hana pre-checks to verify if upgrade is possible. For more information, see the log file of the background job S4_PRE_TRANSITION_CHECKS.AS4. The following is the content of the summary error log file:

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Execution of S4Hana pre-checks to verify if upgrade is possible ERRORS and RETURN CODE in S4_PRE_TRANSITION_CHECKS.AS4

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

4 ETG012 "Start Time Stamp 20160421130412 (2016 04 21;" "13:04:12)"

4 ETG012 "SAP S/4HANA Pre-Transition Check Class Consistency" "Checks."

4 ETG011 "The Check Program is started via SUM."

4 ETG011 "System ID: AS4; SAP_BASIS 740, SP 0008."

4 ETG012 "The software component exception list file exists" "and contains 19 entries."

2EETG012 "Overall Result: The SAP S/4HANA pre-transition" "check data is NOT consistent !!"

4 ETG011 "UIX01TRV"

4 ETG011 "UIX02EA4"

4 ETG011 "UIX02EAP"

4 ETG011 "UIX02RT4"

4 ETG011 " "

2EETG011 "1 Software Component with errors:"

4 ETG012 "The used check class is CLS4H_ECC_DIMP" "(application component IS-A)."

4 ETG012 "Dynamic call of class CLS4H_ECC_DIMP, method" "IS_SW_COMPONENT_USED successfully executed."

4 ETG012 "ECC-DIMP is used and relevant for SAP S/4HANA" "pre-transition checks."

4 ETG012 "Dynamic call of class CLS4H_ECC_DIMP, method" "GET_MINIMUM_TARGET_RELEASE successfully executed."

4 ETG012 "The check requires the minimum target release" "ECC-DIMP 999 SP 99."

2EETG012 "Source sw component ECC-DIMP: Target sw component" "ECC-DIMP: no upgrade target release available !"

4 ETG012 "The used check class is CLS4H_SAP_APPL" "(application component LO-AB)."

4 ETG012 "Dynamic call of class CLS4H_SAP_APPL, method" "IS_SW_COMPONENT_USED successfully executed."

4 ETG012 "SAP_APPL is used and relevant for SAP S/4HANA" "pre-transition checks."

4 ETG012 "Dynamic call of class CLS4H_SAP_APPL, method" "GET_MINIMUM_TARGET_RELEASE successfully executed."

4 ETG012 "The check requires the minimum target release" "S4CORE 101 SP 0000."

2EETG012 "The target release 100 SP 0001 is lower than the" "required minimum target release 101 SP 0000."

Why is asking for Target Release S4CORE 101 SP 0000 When Maintenance Planner calculated for S4CORE 100 SP 0001

Also target release ECC-DIMP 999 SP 99 does not look valid.

I found out these errors are related to Notes  2185960 and 2194272 which contains Check Classes, but couldnt find out why the its showing that message


Hope anyone faced this and could provide some help on how to overcome this.

Best

Martin

Accepted Solutions (1)

Accepted Solutions (1)

ORU
Advisor
Advisor
0 Kudos

Hi Martin

please have a look to note 2310116 - Report R_S4_PRE_TRANSITION_CHECKS return errors on ECC-DIMP

regards Oliver

former_member229542
Active Participant
0 Kudos

Thanks Oliver

Indeed, I had to apply SAP Note 2310116 and also Update all available S4TC notes since one of them was outdated.

Regards!

dkle
Participant
0 Kudos

Can someone from SAP basis team mention this note in the main "S4TC"-note?:

2182725 - S4TC Delivery of the SAP S/4HANA System Conversion Checks

It should definitely be a sideeffect note of 2182725.

dkle
Participant
0 Kudos

The note you mentioned is now in status "not released" for over a week. I hope it gets released really soon!

Former Member
0 Kudos

Hi all,

I am also facing the error "The target release 100 SP 0000 is lower than the required minimum target release 101 SP 0000" in R_S4_PRE_TRANSITION_CHECKS and the latest sap notes have been applied.

While pending OSS to feedback, want to know if anyone have a solution for this ?

former_member229542
Active Participant
0 Kudos

Hi Shing

Are you upgrading to S/4HANA FPS 01 or 00? On your log it says "The target release 100 SP 0000" and I think the minimun is PFS 01

Best

Martin

Former Member
0 Kudos

Hi Martin,

The target is S4CORE 100 SP01, as generated from the maint. planner.

Somehow the pre conversion checks program is checking against S4CORE 101, which has not been even released yet i believe.

DominikEggimann
Explorer
0 Kudos

Hi We have the same problem. "The target release 100 SP 0002 is lower than the required minimum target release 101 SP 0000" We are also waiting for response from SAP.... Do you already have an answer? Or you have a solution? Best Niick

former_member229542
Active Participant
0 Kudos

HI Niick.

There arena couple of notes missing from S4TC Main Note. Perform a Note search for all "S4TC" Notes in and after applying all of them it should fix the issue

DominikEggimann
Explorer
0 Kudos

Hi Martin That is the solution. After what felt like 300 installed notes, the error no longer came. Thanks for the hint. Best Niick

Answers (0)