Hi all,
I faced the issue in SAP ME when I add a non BOM Component with the as-built configuration activity from the POD that it can be added but no message can be seen in SAP MII.
The only message i can get by adding non-BOM components is the following error:
"BAPI CALL FAILED! Error in Goods Movement. Enter Storage Location.
In the material maintenance, the ERP production storage location for the test componnt is filled, but the ERP Putaway Storage Location is empty. When I fill the Putaway Storage Location with a storage location for the material, no message is sent to MII.
Therefore, I cannot see anything in ECC about the consumption of Non-BOM components out of SAP ME. Based on ME help, the component is not integrated in the Yield confirmation, therefore I am looking for anothe rmessage to send to MII/ECC to have the information in ECC about the consumption.
Thanks for any solution or advice.
Hi!
Including GM into Yield Confirmation depends on how you executed SAPMEINT CTC: the respective checkbox is unselected by default and thus GM is included in Yield Confirmation.
Not sure if non-BOM components are supported, but you can try to specify SL for the Inventory ID which you assemble by means of As-Built Config. If SL is not there, the system should take it from the material but there might be an issue - so I would try SL at Inventory level first.
Regards,
Sergiy
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks for your answer.
I tested again to add the non-bom component with an Inventory ID. I also checked before that the Inventory ID has a storage location assigned.
I can successfully add the Non-Bom component, but in MII I can only see a Yield Confirmation which does not contain the information bout the non-Bom Component. Therefore still, also with Inventory ID, no information about the Component is sent to ECC (or MII).
Is there another message / confirmation to send this Non-BOM Component information to MII/ECC?
Hi!
As I wrote above, "including GM into Yield Confirmation depends on how you executed SAPMEINT CTC". So, how did you execute CTC, with which option? If you did not selected the option intentionally, then it is unselected by default and thus GM should be included in Yield Confirmation, and if it is not, then it is a setup issue.
Regards,
Sergiy
According to
The Component Assembly for As-Built Configuration is not included. Therefore I am not sure if there is a direct relation to the SAPMEINT CTC. General Goods Movement is included in SAP MEINT (bom-components for example) are consumed as planned. Unfortuanetly, I cannot check at the moment the field in the CTC, but as said other goods movements with 261, 311 are working fine. Just not the one triggered in As-Built Configuration.
Regards,
Milan
I was now able to go into the system and check if the how the CTC is configured:
As you can see, both of the options have been ticked. These were the option you meant, right? The issue is still persistent so are there other operations or messages possible to send Non-Bom components consumption to SAP ECC? Thanks.