cancel
Showing results for 
Search instead for 
Did you mean: 

Inspection type deactivation _ GR Stock posting to UNRES

0 Kudos

Dear all,

Can anyone help with a way to prevent the stock posting to QI stock during GRN, During the following situation.

1. Material deactivated for Inspection type 01.

2. GR for material for the PO which was created earlier date than the deactivation date( it post the material to QI without Inspection lot).

3. To avoid the GR posting to QI, I was trying to post the stock to UNRES by selecting the field Post to unrestricted stock during GR.

But this does not work and stock posted to QI.

How can we control THE STOCK TO POST TO UNRES stock during the GRN itself.

Whether the selection option will not work.

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi

1.

Cancel GR

2.Then Cancel PO

3. again create PO >> Post GR again

0 Kudos

Hi Sujit,

Yes I agree that first we need to cancel GR, then RE-GR is fine.

But in GR screen will the system allow us to Select the option to post the stock to UNRES.

why I am asking you, once I try this it was allowing and shows an error message.

busyaban7
Active Contributor
0 Kudos

Hi KK,

As Sujit suggested you correctly, have you tried creating a new PurOrd or using the same old PurOrd for RE-GR?

Please can you share the error message number and screenshot so that we can recheck.

Thanks,

Arijit

0 Kudos

This message was moderated.