on 04-15-2016 12:36 PM
Hello All,
i am installing IDES ECC 6.0 Ehp7 system through SWPM tool. Currently i am in the phase " Configure database components" i got the error "Assertion failed: Unable to setup the password encryption for database connects". i have checked the logs its the same error. Kindly please help me resolve this issue. I didn't find any sap relevant note for this issue. i am attaching the sapinst_dev log.
Regards,
Aamir
Hello,
In your sapinst_dev, we can read:
TRACE 2016-04-15 09:57:41.048 (SIDF\ERPAdmin)
syb_isql_pipe: The current 'max memory' value '2621440', is not sufficient to change the parameter 'net password encryption reqd' to '1'. 'max memory' should be greater than 'total logical memory' '2624261' required for the configuration.
Hence, the assertion failed error message "Unable to setup the password encryption for database connects".
You will have to increase your max memory size.
HTH
Cris
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Additionally, you may want to consult PDF Best_practices-SAP_ASE attached to SAP Note 1680803 - SYB: SAP Adaptive Server Enterprise - Best Practice for SAP Business Suite and SAP BW .
In ASE Sizing section, we provide examples of system sizes and recommended ASE configurations for SAP Business Suite.
Regards,
Cris
User | Count |
---|---|
93 | |
10 | |
10 | |
9 | |
9 | |
7 | |
6 | |
5 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.