on 04-13-2016 1:44 PM
Dear Vishal,
The error says processing of product/planning failed in low-level code 1
The concept of low-level code is as below
I suspect you must have run multi-level BOM for the product and the planning failed at one of the input product level. Meaning if A is output product with b + c + d as input, if you run mrp at a, it also plans at b and c and d and the planning failed at either b or c or d.
Regards
Leo