Hi,
I am currently trying to integrate PPM with PS system and I am struggling to automatically create the PS project Structure from the PPM Project.
I assume that all the required config was made and when I perform automatic PS project creation the status on Project is transferred:
However, when I open the CN43N report in the back-end system, there is no project created.
Could you give me some hints where could be the problem?
Hi Emil,
Check the accounting integration errors using t- code COCPCPR. It will give you the reason why the project was not created in ECC system..
Cheers
Sammar