Consistency check in demand Planning

Former Member

Dear Experts,

Need quick help on types of consistency checks for Demand Planning.

By point wise, need help in knowing types of consistency checks required for following activities.

1 . Type of consistency check required before and after planning area initialization every month.

2. Type of consistency check before and after cvc creations automatically (frequency- monthly once ) and manually when required cvc

3. Type of consistency check before releasing forecast to SNP.

4. Type of consistency check before taking backup of monthlyplanning to cube for KPI.

TIA

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi

Please find the answers to your different questions.

1 . Type of consistency check required before and after planning area initialization every month.

/sapapo/ts_pstru_cons_check

/sapapo/ts_lcm_plob_delta_sync

/SAPAPO/TS_LCM_CONS_CHECK

2. Type of consistency check before and after cvc creations automatically (frequency- monthly once ) and manually when required cvc

/sapapo/ts_lcm_plob_delta_sync

/SAPAPO/TS_LCM_CONS_CHECK

3. Type of consistency check before releasing forecast to SNP.

/SAPAPO/TS_LCM_CONS_CHECK with check SNP Master Data option clicked.

4. Type of consistency check before taking backup of monthlyplanning to cube for KPI.

/sapapo/ts_lcm_plob_delta_sync

/SAPAPO/TS_LCM_CONS_CHECK

/SAPAPO/TS_PAREA_EXTR_DS_CHECK


Please do let us know if this information helps you.


Thanks

Amol

Former Member
0 Kudos

Hi Amol,

Thanks for the response. It was really helpful.

How about /SAPAPO/TS_LCM_REORG and how frequently it should be done ?

TIA

Former Member
0 Kudos

Hi

/SAPAPO/TS_LCM_REORG  is house keeping job. You can execute it at least once a week. You have similar job for SNP planning area. So you can run them once a week.

Would be great if you please close the thread as per the steps mentioned below

Thanks

Amol