We are installing FIORI Add-ons into the SAP ECC ERP system EHP7 FOR SAP ERP 6.0 on SAP NETWEAVER 7.4
We have used Mopz in Solution Manger and generated the stack files for the whole ECC Landscape being for ED1 (Development), EQ1 (Quality Assurance) and EP1 (Production) at the same time.
We are using the latest Software Update Manager 1.0 SP16 patch 6
We ran SUM on ED1 (Development) and the FIORI Addons were successfully applied, no problems.
When running SUM for EQ1 (Quality Assurance) we run into the following error:
Error
SUM-Phase: PREP_EXTENSION/IS_TREMPTY
ERROR: Nothing
selected. No packages were selected for the installation. Further
processing makes no sence. Please repeat the module and select the
components to install/update.
It appears that SUM is not finding any updates to apply for some reason.
If we look in SAINT and SPAM we do see the software and addons that need to be applied.
Somethings we have tried already:
1) Switched off antivirus
2) Double checked Stack file for EQ1 and SAR files all appear fine.
3) We ran a SUM reset procedure same error result.
Kind Regards,
Gareth Bosman
Hello Gareth,
Please use SAP transaction code SAINT
Thanks
Yogesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.