Hi all,
we have some production orders in which the target cost is calculating properly and in some production orders target cost is not calculating.
I have checked two orders both the orders have used same kind of material for production and every thing is same but in one order target cost is calculating and in another not.
Both the orders have status REL DLV.
Pls help.
thanks in advance
Hello,
The target cost calculation requires a cost estimate for which the cost component split is active in company as well as in controlling area currency.
The cost component split in controlling area currency is not active for the costing variant (check T-code: OKKN or OKY9).
Therefore the variance calculation issues message KV169 and cannot calculate target costs.
Message KV151 'Only total variance in version & because of missing target
You need to activate the cost component split in controlling area currency in the setting of costing variant. Then the newly created cost estimate will have the correct data. For newly created order, the target cost will be correctly calculated.
For existing orders (with old setting), you can consider to implement SAP Note 1229004 get rid of the problem.
Also Refer consulting note 151579 - Variance calculation: incorrect target cost version 0
Best Regards,
R.Brahmankar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello,
Check OKTZ whether Cost Component Structure is activated or not
Also both the production order are make to stock and for same product.
Check if the material has a standard cost updated through standard cost run. The target cost is based on the standard cost estimate.
Check if there was a valid standard cost estimate at the time of the creation of the order.
Best Regards,
R.Brahmankar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi,
I have already run this tcode KKS2 and it is giving me error Only remaining var. in version 0 - no target costs for 000000239341
warning msg No standard cost estimate for material 80000010 in plant VW01 on 07.04.2016
and information msg One order (item) processed.
I have created another order of same material inwhich the order cost is getting calculated.
regards
Hi
For this month Std cost estimate is taken or not?
If not then you can not get variance and target cost either.
Check below link
Only Remaining var. in version 0 - no target co... | SCN
The order which show target cost is created on which month?
Regards
Prasad