on 04-05-2016 2:17 PM
SAP BW 7.01 EHP1 can be connected to SAP ECC 6.0 on Hana SPS11?
We are migrating a SAP 4.7 (ERP) to SAP ECC 6.0 on Hana SPS11, but we didn't want to migrate the SAP BW 7.01 SPS6 EHP1 at this time.
Can we keep the version of BW mentioned before without problems? If not, what is the version that should migrate the BW to connect to ECC 6.0 on Hana SPS11?
Thanks a lot!
SAP ECC 6.0 on Hana SPS11 only can be connected with the SAP Netweaver 7.3 or upper.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.