Hi All,
I have configured material determination for our company need, but I faced below issue in ATP. I will explain the scenario,,,,
Master Data in VB11
ABC - Main material
PQR - Alternative material without selecting MRP indicator
XYZ - Alternative material with selecting MRP indicator
Material substitution reason is 0004 and only outcome is B. Strategy and Substitution category is blank.
We do not maintain stock for ABC. System has stock for PQR 120qty and XYZ 50qty.
I created sales order for 200qty and material determination works properly as below.
ABC -------> 200
PQR --------> 120
XYZ --------> 80
When I looked at the each schedule lines, PQR has confirmed with 120qty.
And XYZ has confirmed only 50qty. System does not propose date for remaining balance 30qty. But my expectation is XYZ should have two schedule lines with 120 (confirming available stock) and another schedule line for remaining 30 (after considering in-house production leadtime in MRP).
And system give a msg "Quantity of 30 NUM remains after product selection (item 000100)"
Could you pls help me to solve this issue
Thanks
Br
Amal
The concept of product selection does not support forward scheduling. This is explained in note 50203
G. Lakshmipathi
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
98 | |
12 | |
10 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.