Hi experts,
when trying to log a secondary NC code in the VTR POD the Add-Done and Add buttons are greyed out.
I log the primary NC Code "REWORK" at a assembly operation with the Touch operation POD.
After that I use the VTR POD for a rework operation. There I start the SFC at the operation then choose the primary NC code "REWORK" in the NC Data Tree. After that the Add and Add-Done buttons are greyed out (see picture below).
The primary code is configured the following:
The secondary code:
The NC group Primary is primary is assigned to a assembly operation. The NC group secondary is assigend to a validation operation.
Does someone of you know, why I can't Add a secondary NC code?
Thanks in advance,
Nico
Hi Nico,
Please check which NC Client is used by VTR POD, and then if that NC Client allows a user to log a secondary NC codes.
Regards,
Sergiy
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
95 | |
11 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.