cancel
Showing results for 
Search instead for 
Did you mean: 

Secondary NC Entry in VTR POD not possible

Former Member
0 Kudos

Hi experts,

when trying to log a secondary NC code in the VTR POD the Add-Done and Add buttons are greyed out.

I log the primary NC Code "REWORK" at a assembly operation with the Touch operation POD.

After that I use the VTR POD for a rework operation. There I start the SFC at the operation then choose the primary NC code "REWORK" in the NC Data Tree. After that the Add and Add-Done buttons are greyed out (see picture below).

The primary code is configured the following:

The secondary code:

The NC group Primary is primary is assigned to a assembly operation. The NC group secondary is assigend to a validation operation.

Does someone of you know, why I can't Add a secondary NC code?

Thanks in advance,

Nico

Accepted Solutions (1)

Accepted Solutions (1)

sergiy_katerinich
Active Contributor
0 Kudos

Hi Nico,

Please check which NC Client is used by VTR POD, and then if that NC Client allows a user to log a secondary NC codes.

Regards,

Sergiy

Answers (0)