on 03-11-2016 8:04 AM
hi experts,
after a sysetm copy (prod->qual) we have the requirement, also to put some documents from prod-content server to test-content server.
Does anybody know, if there is a report to extract/import files from one repository into another one, selective?
We are using the file-based content server from SAP.
Kind regards
Does nobody have an idea regarding this?
Kind regards
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Anon.
Is it on Max db? refer the SAP Note 1014782 - FAQ: SAP MaxDB system copy point number 8.
Regards
SS
Hi Anon.
I am not sure, Could you check this SAP Note
798500 - Dealing with repositories after a system copy
Regards
SS
Hello Sriram,
interesting note, but not exactly what we are looking for.
BTW, we have solved the problem after system copy with logical OAC0-names, so we don#t have to do a lot of rework after copy.
We are using filebased cs instead of maxdb one, maybe another question on that way.
Is there any recommendation which content server to use? Are there advantages in MaxDB based one? (e.g. performance, stability, ...)
Kind regards