Inspection lot operation missing

Former Member
0 Kudos

Dear sir,

The In-process inspection lot where the QM01 control key Operation missing in inspection specification.

But in the routing the operation is maintained and characterstic also available.

Thanks and Regards.

Vishnu Ravi.

Accepted Solutions (0)

Answers (2)

Answers (2)

busyaban7
Active Contributor
0 Kudos

Hi Vishnu,

Form your issue description I didn't got the issue right. It seems, though MIC's are assigned in the routing operation, still for the in-process inspection lot, you didn't see it. Is that understanding correct?
If so, what is the system status for the inspection lot which got created? Also please check in SCN for KBA related to this topic...

Thanks,

Arijit

Former Member
0 Kudos

Hi All ,

In the Inspection Lot where assigned inspection specification the QM01 Control key assgined Operation is missing .

But in the Routing of the same material the QM01 control key operation is Available .

Thanks and Regards.

VishnuRavi.

former_member184574
Active Contributor
0 Kudos

Hi,

What is the control key maintained in the routing for the operation which is assigned with MIC's ?

Check the settings of that Control key. It should be marked with indicator Insp.char. required.

Check and revert...

Thanks

Kumar