on 03-08-2016 12:58 PM
Dear Experts,
I have an issue with the SAP_PP_020 heuristic. The problem is that the LLC is not calculated for the components that are externally procured.
The components are included in a PDS for the FG. They do not have a source of supply (the info record is not CIF-ed at the moment).
The SAP_PP_020 heuristic is returning the following message: "No supply sources were found for the model 000".
My question is: Is it necessary to have a source of supply for the component? What workaround do you propose?
Thank you in advance,
Hrvoje
Hi Hrvoje,
It's not necessary to have a source of supply for the component, but the finished product which has the PDS consuming the externally procured component should be included in the selection of the Stage-Numbering Algorithm.
If the externally procured components do not have a source (TLane), make sure note below is implemented in the system:
2048721 - SAP_PP_020: Stage-Numbering Algorithm heuristic does not calculate the low level code for products without a source of supply
Regards,
Tiago
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Hrvoje,
Source of supply is not required for components.
You need to run MRP heuristic "SAP_MRP_001" along with stage numbering algorithm to generate low level codes.
Thanks & Regards,
Jyoti
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
15 | |
4 | |
3 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.