Former Member
0 Kudos

Hi everyone

If a call between SAP PI and ECC has failed for reason like system shutdown in BPM scenario,how to send an error message to the third-party system indicating that the applicable interface has failed as well as the reason for the failure.

Accepted Solutions (0)

Answers (1)

Answers (1)

former_member186851
Active Contributor
0 Kudos

Hello Smruthi,

Are you looking for CCBPM or NWBPM?

CCBPM means try using Control step

http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/200a4efc-f547-2a10-02bf-ada1d207d...

And in NWBPM you have option to add exceptions which will trigger an other interface in case of any failures.

Former Member
0 Kudos

Hi Raghuram,

I am using CCBPM.

By using control step itself will send the error message to Sender system or else do we need to do anything else.

former_member186851
Active Contributor
0 Kudos

Hello Smruti,

Refer the link I shared,Guess control step should be good enough.