cancel
Showing results for 
Search instead for 
Did you mean: 

Automatic multilevel packaging with reference material

0 Kudos

Hello all together,

i need your support. I have the following situation:

We have different kind of materials (egg. picture only 3) and there is only one box type. A box always contains only one material with an amount between 1 and the the max. amount of the single material. Now we want to pack all material in boxes and the boxes on pallets to get mixed material pallets. 


Now we want use the functionality automatic packaging. But we dont know if it is possible to use reference materials to pack all products in boxes and than all boxes on pallets and how.


Could you help me?


Best Regards Matthias

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi,

Yes, you can maintain multi-level packaging in SAP WM.

First configure your packaging information using POP1 with reference to packing material.

Determination finds with POF1.

For more information please find through below link