Hi friends,

SRM provides a functionality of allowing bidders to add items in a bid. This can be done by purchaser during RFQ preparation by marking a check box "Allow bidders to add items".

Now when the bidder adds items in the bid and we want to post the PO in backend (extended classic scenario), how does it work for new items?

I think we will have to create master records for all these newly added items, if does not exist in R/3 backend.

If its a free text item, then do we need to create material master in SRM / R/3 backend?

Your help will be highly appreciated.

Best regards,

Prashant

Accepted Solutions (0)

Answers (1)

Answers (1)

former_member195032
Active Contributor
0 Kudos

Hi Nikhil,

you can get all these information on link

http://help.sap.com/saphelp_srm50/helpdata/en/61/c3833cfa3dbc2ce10000000a114027/frameset.htm

Free text purchase will be done using some meterial group and you can create follow on document using those free text items.you donot material master as such.

I donot have any idea about how you have configured your tax and other stuff in backend system.

But I donot think,you require to have material master if BID is with free text.