on 02-18-2016 9:20 AM
Dear SAP Experts,
I have problem with Load Master Data step in section C.Upload. After import system done in new machine, i run program /SAPAPO/OM_LC_DOWNLOAD_UPLOAD to upload livecache data from sap database to livecache database. All steps before Load Master Data in section C. Upload was done successfully. When i clicked Load Master Data button, Information about load master data in operating client is started was appeared but after that, status of Load Master Data is still "liveCache does not yet contain master data".
There are 2 background job for this process. Both of them was completed successfully with 0/1s duration.
Background job 1
Background Job2
I have continued to next step until step 13 and the status of live cache still does not contain master data.
Is there any thing that i missed before i load master data?
Please help give me suggestion to fix this issue.
Thanks & best regards,
Husin
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Nikhil,
My screenshot in discussion is screenshot when i finished with the section C with ignoring error in step 4. When execute step 4, step 1-3 was in green indicator, so i believe the steps above is done correctly. Is there anything that i need to do before doing step 4?
Thanks & best regards,
Husin
User | Count |
---|---|