on 02-04-2016 3:11 AM
Hi gurus,
I have a project where we have 4 levels of wbs.
In level 4 we have post actual cost which we can see in CJI3, eg A-01-01-01.
when we run result analysis for the same WBS , i can see the value of RA in KKA2 for this same level 4 WBS.
However in t-code KKA2 , if i enter level 1 wbs i.e A, i can see only planned values , rest RA values are 0.
As per me RA value should be available at project level.
Please let me know where i am wrong and what would be the possible solution.
Regards
R SHARAM
Hi Sharma,
Standard RA will summarize the costs to the billing element level. Can you please check level one is the billing element and not the fourth level.
Note : If you are using RA with Expert mode then, we need to check the Expert mode config. please share a screen shot of it.
Thanking you
Vengaiah Chowdary
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
RA runs on the WBS that has a RA Key. RA aggregates all lower level PS objects for plan and actual costs as long as a lower level WBS does not have a RA Key. Is a lower WBS has a RA Key it is not included. So, typically only the highest level WBS has a RA Key.
Do you have a RA Key on a lower level WBS?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
100 | |
11 | |
10 | |
6 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.