Hi all

I am using CTM for continous planning and I get multiple orders of 0,009. What is the logic of that behaviour? How can I get just one order?

The system is creating small orders at the begining of available capacity.

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

Hi Carlos,

Please check in the SPRO, CTM Global value what is your strategy for Late Demand. Should be domino.

Check this thread to see some screenshots:   

Thanks,

Regards, Marius

carlos_perez8
Participant
0 Kudos

We are working in MTO scenario and akthough there is capacity available to cover sales order on time, some small orders are created with 0,009 qty. If I round, then the orders are 1 unit qty,

Former Member
0 Kudos

MTO or MTS same things to do!

Thanks, Marius

carlos_perez8
Participant
0 Kudos

I changed it to domino and still same results

carlos_perez8
Participant
0 Kudos

I change lot size in product master but ctm is not taking the lot size into account. It is set in the profile to use lote size

Former Member
0 Kudos

Try to increase Maximum Time for Scheduling a Demand in the tab Settings - Technical settings to 180 or 300 seconds. Do you have enough memory? Does the CTM run takes a long time? 

carlos_perez8
Participant
0 Kudos

Thanks for your reply. I am just testing the model with one item/sales order, so I don´t think it is a problem of memory.

I changed Maximun time to 99999 and still the same.

If the order is up to 1000, it does not create small orders, but if the orders is more than 1000 then small orders.

See attachment

ruchi_das2
Active Participant
0 Kudos

Hi Carlos,

When in MTO scenario, you need to check the indicator lot Size Always in the location-product Lot size tab. On the other hand, CTM should work fine in MTO even without checking this indicator.

What are the min & max lot size on the PP/DS PDS and what is the continuous resource consumption for the activity?

Regards

AK

carlos_perez8
Participant
0 Kudos

Hi AK

The check is already marked.

In the PPDS for CTM I have the following

min 0- max 99999999

consumption: 1 s

Former Member
0 Kudos

Is the lot size procedure Lot - for - Lot?

carlos_perez8
Participant
0 Kudos

Fix lot size

Former Member
0 Kudos

Please change to Lot for Lot, delete the old planned orders and run CTM again.

carlos_perez8
Participant
0 Kudos

Still same results. And for components CTM is ignoring lot sizes from product master data

RahulHanda
Active Contributor
0 Kudos

Hi

Check SAP note

397734 - CTM: Unnecessary order splits


and try planning parameter mentioned and let us know.


Regards

Rahul

carlos_perez8
Participant
0 Kudos

Thanks for your reply but I don´t understand what do I have to do....

Former Member
0 Kudos

Carlos,

Did you read the note?  In particular, did you check to see if that note is relevant for your system?

Best Regards,

DB49

carlos_perez8
Participant
0 Kudos

It is not relevant.

Also if ctm is not taking into account lot sizes of material for continous time.

In the profile I have use lot size

carlos_perez8
Participant
0 Kudos

It is creating one second orders just after the non working time...

ruchi_das2
Active Participant
0 Kudos

Hi Carlos,

Can you increase the time in the setting "Maximum interval between activities" (CTM Profile Tab Setting - Master Data Setting - Inhouse production) to lets say 30 days and test.

Regards

AK

carlos_perez8
Participant
0 Kudos

Thanks for your reply AK, but still the same and lot size for component is not considered by CTM from master data.

Former Member
0 Kudos

Hi Carlos

Please check if you have maintained the CTM profile correctl. Please look for planning parameters on CTM profile.

Please let us know if this information helps you.

Thanks

Amol

carlos_perez8
Participant
0 Kudos

I have the same settings...

Former Member
0 Kudos

Hi Carlos

Sorry if I have miss communicated, but you require to change the rounding planning parameters to Round order Qty as below.

Please also maintain the planning parameter which is mentioned below i.e. Precision

You can go to CTM profile header -->Control-->Planning parameters.


Please let us know if this information helps you.

Thanks

Amol