cancel
Showing results for 
Search instead for 
Did you mean: 

Distribution of FTOs & LUs to downstream systems

Former Member
0 Kudos

Hi Team,

Need small clarification.

I have down streamed newly created FTOs and LUs to GTS Quality system and my question is:

How to downstream to Production system..should i be doing directly from Dev and select the Production logical system as TR is not getting generated.

Or I have to move TR to GTS production and from there is copies to R/3 Production.

Please guide me.

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi Venkat,

You can push those from your Quality to production system after testing. You should have access to same transaction in your qualilty system.

Thanks

Dhilipan