on 01-25-2016 6:43 AM
Hi Team,
Need small clarification.
I have down streamed newly created FTOs and LUs to GTS Quality system and my question is:
How to downstream to Production system..should i be doing directly from Dev and select the Production logical system as TR is not getting generated.
Or I have to move TR to GTS production and from there is copies to R/3 Production.
Please guide me.
Hi Venkat,
You can push those from your Quality to production system after testing. You should have access to same transaction in your qualilty system.
Thanks
Dhilipan