CCBPM option not visible in ID PI 7.4 Dual Stack

RautVinit
Explorer
0 Kudos

Hello Experts,

I have a requirement to create ccBPM on SAP PI 7.4 dual stack(SP 😎 system. I could create Integration Process in ESR but I don't see any option for Process Component in integration Directory.

Could you please suggest how can I configure ccBPM on SAP PI 7.4 Dual Stack? I dont want to go ahead with NW BPM.

Thanks in Advance.

Vinit.

Accepted Solutions (0)

Answers (5)

Answers (5)

RautVinit
Explorer
0 Kudos

Hi All,

I checked RWB and found below error for integration engine and BPE(Mentioned in integration server option).

"Neither messager server nor application server are defined for system."

Mapping Runtime I can see its Green and working.

I tried PIMON and found integration server but no option as integration engine.

I am checking with Basis team if we have installed Dual stack PI system correctly.

Thanks,

Vinit.

former_member186851
Active Contributor
0 Kudos

Hello Vinit,

Two cases should be possible.

1.Single stack installation done.

2.Dual stack installation not properly installed.

But based on your ID screenshot my guess would be single stack installation done.

RautVinit
Explorer
0 Kudos

Hi Praveen,

I checked SLD instance and found Application server ABAP entry.

Are we missing some option while installation?

Thanks,

Vinit.

nitindeshpande
Active Contributor
0 Kudos

Hello Vinit,

In Runtime workbench or PIMON are you able to see Integration Engine option?

One more thing is, in Dual-stack both Classical and ICO scenarios are supported, hence based on that we cannot convey whether it is Dual-stack or single-stack system.

Regards,

Nitin

RautVinit
Explorer
0 Kudos

HI Both,

Thanks.. We have both the stacks(ABAP+Java) available on our PI system. I can login to ABAP stack and from SXMB_IFR transaction, it navigates to Integration builder webpage on browser.

I shall have a word again with Basis team and cross check if there was any option selected during installation.

Regards,

Vinit.

former_member186851
Active Contributor
0 Kudos

Yes Vinit. Confirm it.

But from the screenshot it clearly shows Single stack installation.

former_member182412
Active Contributor
0 Kudos

Hi Vinit,

You can check what components installed in the system by open below URL.

http://<pihost>:<piport>/utl/SLDInstancesDetailedInfo.jsp

Example dual stack installation.

Example Single stack installation.

Regards,

Praveen.

former_member186851
Active Contributor
0 Kudos

Hello Vinit,

In ID you will have it as NEW INTEGRATION PROCESS.Check for that.

RautVinit
Explorer
0 Kudos

Hi Praveen/Raghuraman,

Thanks for reply.

I am able to create Integration Process in ESR. But I don't see any option to create Integration Process in Integration Directory.

For reference, I am attaching Tools and Create Object option in ID.

Tools Option in ID:

Create Object Option in ID:


Kindly suggest.


Thanks,

Vinit.

former_member182412
Active Contributor
0 Kudos

Hi Vinit

it is look like you Pi system is single stack not a dual stack because you dont have any objects related to dual stack in the above screen shot, confirm with basis which did they choose when they install the system

Regards

Praveen

former_member186851
Active Contributor
0 Kudos

Hello Vinit,

As Praveen Suggested Installation seems to be single stack PO.

Even there are Agreements and determination objects for Classical scenario.

If you wish to migrate to NWBPM, refer the below link

former_member182412
Active Contributor
0 Kudos

Hi Vinit,

Dont you see these options??

Repository:

Directory:

Regards,