on 01-19-2016 7:58 PM
Hi All,
II am facing an issue in DBclone step. It asked for Repeat phase, I have continued it but I am not sure whether it will get success or not. Can anyone please tell me how to resolve this issue.
Please find the logs of DBCLONE.LOG
2EETQ231 RFC Login failed
3EETQ399 Checking job #0 'RSUPG_CLONE_TABLES' failed with RFC login to system BID ashost WCBIDDEV nr 00 gwhost WCBIDDEV gwservice sapgw00 failed with code 8 key RFC_TIMEOUT: Timeout while opening a RFC connection.
2 ETQ399 2016/01/19 16:43:42: sleeping 30 seconds
1 ETQ359 RFC Login to: System="BID", AsHost="WCBIDDEV" Nr="00", GwHost="WCBIDDEV", GwService="sapgw00"
2EETQ231 RFC Login failed
3EETQ399 Checking job #0 'RSUPG_CLONE_TABLES' failed with RFC login to system BID ashost WCBIDDEV nr 00 gwhost WCBIDDEV gwservice sapgw00 failed with code 8 key RFC_TIMEOUT: Timeout while opening a RFC connection.
2 ETQ399 2016/01/19 16:47:18: sleeping 30 seconds
1 ETQ359 RFC Login to: System="BID", AsHost="WCBIDDEV" Nr="00", GwHost="WCBIDDEV", GwService="sapgw00"
2EETQ231 RFC Login failed
3EETQ399 Checking job #0 'RSUPG_CLONE_TABLES' failed with RFC login to system BID ashost WCBIDDEV nr 00 gwhost WCBIDDEV gwservice sapgw00 failed with code 8 key RFC_TIMEOUT: Timeout while opening a RFC connection.
2 ETQ399 2016/01/19 16:50:56: sleeping 30 seconds
1 ETQ359 RFC Login to: System="BID", AsHost="WCBIDDEV" Nr="00", GwHost="WCBIDDEV", GwService="sapgw00"
2EETQ231 RFC Login failed
3EETQ399 Checking job #0 'RSUPG_CLONE_TABLES' failed with RFC login to system BID ashost WCBIDDEV nr 00 gwhost WCBIDDEV gwservice sapgw00 failed with code 8 key RFC_TIMEOUT: Timeout while opening a RFC connection.
1EETQ399 Last error code set is: Batch jobs (DBCLONE1) may still be running: started 3, finished/aborted/running 0/0/3, check SM37 and SM21 for details
1EETQ204 Upgrade phase "DBCLONE" aborted with severe errors ("20160119182751")
SAPup_troubleticket.log
his trouble ticket was created by SAPup on 20160119182752
-------------------------------------------------------------
SAPup broke during phase SUBMOD_SHDDBCLONE/DBCLONE in module MAIN_SHDCRE / Import and Modification Transfer
Error Message: Batch jobs (DBCLONE1) may still be running: started 3, finished/aborted/running 0/0/3, check SM37 and SM21 for details
-------------------------------------------------------------
-------------------------------------------------------------
Summary of SAPup:
-------------------------------------------------------------
SAPehpi Release: lmt_005
SAPehpi Version: SAPup release lmt_005 version 54.000
Start Release: 700
Target Release: 700
-------------------------------------------------------------
Summary of host system details:
-------------------------------------------------------------
SID: BID
Host: WCBIDDEV
MS Host: WCBIDDEV
GW Host: WCBIDDEV
Start Path: E:\usr\sap\BID\DVEBMGS00\exe
Kernel Path: E:\usr\sap\BID\DVEBMGS00\exe
-------------------------------------------------------------
Summary of operating system details:
-------------------------------------------------------------
OS Type: Windows NT X86_64
OS Version: 6.1
-------------------------------------------------------------
Summary of database details:
-------------------------------------------------------------
Database Type: mss
Database Version: 11.00.6020.00
-------------------------------------------------------------
Summary of RFC details:
Dear Satyardha,
I am also facing the same issue, the drive where database is mount is almost full, i have delete the old archive files and continuous the issue is resolved.
Regards,
Atif Saqlain
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Atif,
The issue is resolved from my end. Actually our Database memory is set 13 GB where our RAM capacity is 12 GB. So consumption of SQL Server itself is almost 92 to 95 % CPU Usage and also utilization of full RAM, thus resulted slowness of the System.
I changed the Memory size of DB to 6 GB which resolved our issue.
Regards,
Satyardha
try to start sap system manually and then continue again.
please see this link :
ICNVINIT phase - Software Logistics - SCN Wiki
best regards,
Manjunath Hanmantgad
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello Satyardha,
Could there be any problem with DB?
Can you check DB logs, alerts?
What about disk free space?
Regards,
Yuksel AKCINAR
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
When I am running SUM, it looks fine. But when it reaches to DBCLONE step, Initially it looks fine but later our server became too slow for accessing. When I checked CPU utilization, it is 100% , and physical memory is almost 99%. Total Ram size of our server is 12 GB but it is occupying complete memory at this phase.
From begining I could see CPU utilization and Memory usage almost from the beginning of start of SUM but sever is becoming too slow at DBCLONE step.
Is this issue is because of complete memory usage of RAM? Is CPU and RAM usage impacts the SUM if the utilization is full? Can you please help me on this
As of now, I am running at Pre processing phase and Drive has still 18 GB space, I think this would be enough for running the SUM fine,
Does we have any recommended values for RAM that required to run SUM?
Can anyone please help me on this.
User | Count |
---|---|
85 | |
10 | |
10 | |
10 | |
7 | |
6 | |
6 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.