cancel
Showing results for 
Search instead for 
Did you mean: 

Alerts in PI from ECC Errors

0 Kudos

Hi Experts,

We are trying for Alerts Configuration in PO 7.4 . The PI based Alerts are successfully working , But we need to capture the Application and System Alerts occurring in SAP ECC system . So need assistance in configuring the alerts for ECC.

Thanks & Regards

Amitosh Srivastava

Accepted Solutions (1)

Accepted Solutions (1)

vadimklimov
Active Contributor
0 Kudos

Hello Amitosh,

Please check blog and SAP Note 1584248, they contain description on how to configure propagation of alerts from ABAP backend systems to Alert Engine of an AEX/PO system.

Regards,

Vadim

0 Kudos

Hi Vadim ,

My scenario is file to Proxy. So will the same configuration will work if the message will fail in ECC with application Error , since as per the blog the the Alert generated if in PI SOAP sender channel was stopped.

Answers (1)

Answers (1)

former_member186851
Active Contributor
0 Kudos

Hello Amitosh,

Are you looking to raise alerts raised when SAP system is down, something like this kind of errors?

0 Kudos

Hi Raguram ,

I need to capture the Alert mail when the message [ File - > PI -> ECC ] will fail in ECC for any Application or System Error.

former_member186851
Active Contributor
0 Kudos

Hello Amitosh,

You can create alerts like below(add the ECC proxy channel)

vadimklimov
Active Contributor
0 Kudos

Hi Amitosh,

Alert generation in ECC and its forwarding and processing in PO shall fulfil requirements described by you.

Detailed steps are described in Integrating Alert Framework-Based Systems - Administering Process Integration (PI) - SAP Library, Alert Notification Step-by-Step - Alert Management (BC-SRV-GBT-ALM) - SAP Library and Alert Configuration - Integration Engine - SAP Library together with few comments provided in the SAP Note I referred to earlier.


Following configuration shall be performed:

  • Define alert configuration in ECC (as described in "Alert Notification Step-by-Step");
  • Configure RFC destination in ECC (as described in SAP Note 1584248) and corresponding resource adapter in PO (as described in "Integrating Alert Framework-Based Systems");
  • Ensure alerting is active in Integration Engine of ECC and Advanced Adapter Engine of PO (as described in "Alert Configuration");
  • Maintain respective alert rule in Integration Directory of PO and activate it.

Regards,

Vadim