Experts,
I meet a question about the sampling procedure selection for production order when GR
I have GR from 2 kinds of production with inspection origin 04 inspection type 04
-- discrete prodution production type ZPP1 ,I need 100% inspection sample
-- REM repetitive mfg production ,I need 5% inspection sample
The goods receipt from prodution trigger inspection lot, I hope different production order select different inspection sample .
for discrete mfg production , the inpection sample is 100% ,and for REM mfg ,the inpection sample is 5%
How can I do ? Somebody has advice?It would be very much appreciated!
many thanks
Best wishes!
Miriam Zhao
Hi Mishuang
Not sure whether this is already answered ;
You said you have GRs with 2 different inspection origin 04 inspection type 04
1 . Discrete production production type ZPP1 ,I need 100% inspection sample - This can be done by creating a sampling procedure with 100 % inspection.
It can be assigned to a Task list of Usage Discrete type of Inspection type 04.
-- REM repetitive mfg production ,I need 5% inspection sample
>> I think this is Inspection lot origin 13 for which you have different Usage & different task list ( Routing)
So Here task list type,usage will be different from 04.
Hope you have already done this as you are already using them.
Now coming back to your query of 5% inspection sample during REM ,you need to select the "% sample type" in sampling procedure & assign this SP to MICs of REM.
*You can not use different operations here as your Process & task list type are different !
*If you are not using task list,then at Inspection type level you can enter the % of sample.
Hope this will some value...!
Sujit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,Dear all,
Thanks for your answer .
Sorry.My question havn't got any good solution.
My question is when GR from prodution ,I need the material from different production type to get the different sampling procedure.
For One matereial A , REM product , active the QM view with inspection type 04
when GR(MVT 131) from REM repetitive mfg production ,I need 5% inspection sample.
But for some rework order which discrete prodution production type ZPP1 ,
when GR(MVT 101) from discrete prodution ,I need 100% inspection sample.
At present ,No matter what,when GR from production ,the inspection Sample is 5%,both the REM and the Discrete production.
BUT Inspection type 13 is for In-process insp. for repetitive mfg something like inspection type03
I know that give the material A a inspection type 03 ,IPQC for the last operation a quality inspection for the rework order in discrete production avialiable.But it hope a good one.
BR
Miriam Zhao
You should create two operations in the inspection plan. Set the description of operations as 'Discrete Manufacturing' and 'REP manufacturing'.
Before that, as Kumar suggested, make two SP with required sample size.
In each of the operation, when you insert the MIC, assign respective SP.
So once you get the inspection lot, system will prompt you to select an operation to proceed to result recording. Choose the desired one and complete the transaction.
NJ
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Create two different sampling procedures one with sampling type 100 % and one with sample percentage (maintain with 5%)
Assign the above sampling procedures to the MIC's in the inspection plans of the respective materials.
Once you do the above settings when you do the GR for production order or in REM GR you will get inspection lots with respective sample sizes.
Check and revert.
Thanks
Kumar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
95 | |
11 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.