cancel
Showing results for 
Search instead for 
Did you mean: 

FRB1 not calculated in CK11N

Former Member
0 Kudos

Dears,

I need to execute a material cost estimate considering contract price plus the freight  where 2 different conditions are present in the schedule agreement. No PIR would be maintained as per the business process.

1) PB00

2) FRB1

The scope is:

- linking PB00 to one cost component

- linking FRB1 to another cost component.

I did the setup like OKTZ/OKKN/OKYO etc.

But when I run CK11N to do the cost estimate, it doesn't show the FRB1 value in the result.  Can anyone tell me any setup I missed and how I can resolve this issue?  Thanks!

Accepted Solutions (0)

Answers (1)

Answers (1)

former_member198692
Active Contributor
0 Kudos

Hi,

Check whether you assigned origin group in material master also

Rgards

Prasad

Former Member
0 Kudos

Hi Prasad,

Thanks for the reply. actually it doesn't work to assign the origin group in the material master. Basically it should depends on the OKYO setup.

Jimmy

former_member198692
Active Contributor
0 Kudos

Hi,

thanks a lot for rectifying me.

As per my opinion The costed material should have a price in the info record please check it .

Regards

Prasad

Former Member
0 Kudos

Hi,

PIR is not mandatory since it should capture the condition value from PB00/FRB1 from the schedule agreement.

Jimmy