on 01-04-2016 4:10 AM
Hi,
I am trying to model simple lot size (static/dynamic) and simple safety stock (safety days/safety stock) in IBP supply.
I have added the key figure - SUBPERIODSOFSUPPLY and COVERAGE into the planning area.
Also added the attribute "lotsizepolicy" in the location product.
Heuristic is not considering any lot size policy (neither 1 nor 2).
Also added attributes - safety days ind, safetydayssupply and safetystock.
But Heuristic not considering any safety stock input, neither safetydays nor safetystock.
Anybody who has been successful in modeling these parameters in IBP supply? Appreciate any help in this.
Thanks.
Pravat
Hi Pravat,
Can you confirm if heuristic is running without any error and only SUBPERIODSOFSUPPLY is not considered? If this is the case, then please check if key figure is configured properly at correct planning level and I/O for supply planning is selected.
You can also refer SAP4 model or SAP help library for detail-
Key Figures for Supply Planning - SAP Integrated Business Planning - SAP Library
Thanks,
Rohit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.