on 12-31-2015 10:52 AM
Hi,
I am using a POSC with following steps Unloading,deconsolidation,putaway.
In the final putaway storage type for putaway storage control indicator value 2- Storage Control: Putaway with Product WT is chosen.
With this when we putaway one material, system is creating HU WT for the final putaway. But the same is not happing when we have mixed products into single HU and getting below error during WT creation for first step.
when I further analyzed the log, as a final step of determine source data-start for some reason system did not determine the HU type which happening when we have single product.
please refer below screen shot of the above error log
Log details when single product is being putaway
BR
Raghava
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Did you maintain the process type determination indicator for second material.if you want to use De- Consolidation process , that storage process should be applicable for both materials.
Are you using the same packaging material , which you used for a single product ?
if you are using the new packaging material for HU creation, check the HU type which is assigned for the packaging material.
And also check the putaway strategy ( putaway control indicators ) for the product.
C K Reddy