cancel
Showing results for 
Search instead for 
Did you mean: 

HU Loading Process without Transportation Management

Former Member
0 Kudos

Hi all,

We are configuring the shipping process without TM. So the business flow is:

--> Create Sales Order

--> Create Delivery

--> Create TO and Picking (RF)

--> Packing (using packing station) to generate HU

--> Load HU (using LM31)

--> PGI from Delivery

However the system allow us to do PGI without the HU loading process. How can I handle this since I do not use TM? To turn obligatory the loading of HUs.

Is there any badi/exit or configuration to do it?

Thanks

Gian

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Please check this thread:

Answers (0)