on 12-08-2015 2:31 PM
Hi Experts
I am working on BI 7.0 Enhancement pack1 which is a dual stack system (ABAP+JAVA in one system) .My goal is to split Java from ABAP .
My DB is Oracle 12.1 .I am using software provisioning manager 70SWPM SP09 to do the split(option dual stack split) .I am using Keep DB option .I am trying to export the java as the first step and it is failing.I am getting this error "
"Dual-Stack Split for usage type Process Integration (PI) is not supported."
I dont know where sapinst is finding it a PI systems .I have checked all profile parameters but it is erring out with above error message and it aborts the sapinst after the error.
I have two questions
1. Am I doing anything wrong or is there any bug in 70swpm?
2. Has anybody done NW7.0 split with standard SWPM (not 70swpm)
Please help.
Thanks
Amit
steps :
Split procedure
Select keep database option>Central or distributed system
Select export central instance of DUAL –stack system
Error
Hello Amit,
Please post the output of the following URL:
http://<host>:<J2EE Port>/utl/UsageTypesInfo
The above will show you what usage types are installed on your J2EE.
Kind Regards,
Amerjit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello Amit,
There are ways to remove usage types but you would probably fall foul of "unsupported" unless it's done by SAP hands.
I would open a message with SAP and ask them the way forward explaining you want to do a DSS on a system where a usage type (PI/MI) was inadvertently installed but has never been and is not used.
The suggestion to perform a system copy does not resolve your problem as even with the copy method the usage types would still be there.
Kind Regards,
Amerjit
User | Count |
---|---|
76 | |
9 | |
8 | |
7 | |
6 | |
5 | |
5 | |
5 | |
5 | |
5 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.