on 11-20-2015 12:18 PM
Hi All,
I am trying to do Deconsolidation using POSC and somehow it is not working starting from IB01. Here is what I have done.
1. Set up POSC as per below snapshots.
2. Set up different PACI for 2 Products which have different Activity Areas.
3. Different Consolidation Groups for each Activity Area.
4. Created Work Center and assigned Storage Bin to the Work Center.
5. Created PO with 2 materials and later created inbound delivery and packed 2 items into 1 HU.
6. IBD was distributed to EWM and when I try to create WT for step1, system is throwing error which is shown.
I have attached all the config steps that I have done. Request you to check and correct me if I am missing something.
Thank You,
Pavan
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Pavan with the same setting I am able to execute and create the WT (single material per HU) hence to me it looks there are some dependent parameter which is impacting the Storage bin search
Instead of trying with two material in the same HU can I request to try with single material per HU and let us know the result
Hi Pavan
Sort the bin and update decon bin in below tcode.
/SCWM/SBST - Sort Storage Bins
/SCWM/TWORKST - Define Master Data Attributes
with you screen shot it is clear that you have issue with final putaway not decon as system creates two wt one for unload and one for waiting as putaway so your put away sequence is not working.
also this process will work with HU, without HU not possible
check below config
Extended Warehouse Management>>Goods Receipt Process>>Strategies>>Storage Type Search>>Specify Storage Type Search Sequence for Putaway
in this config check your wh+PACI indi+wpt+strategy is updated as per yor master data.
also activate a log with below tcode for more detailed log.
/SCWM/ACTLOG - Activate Application Log
Do not take same example create new and check.
also check producmaster have you updated proper indicator to move.
Provide your reply to move forward. Hope this should resolve your issue.
Regards
Suraj
Hi Suraj,
Thanks for your help. Yes, Deconsolidation is working fine now. Only setting I was missing was sorting bins and Storage Type Search strategy.
Intially, I gave Final Putaway Destination Sto. Type having HU Type check thinking that POSC will be having HUs. However, later, as per your comment, I changed the Final Putaway Destination Sto. Type without having HU Type check and it worked.
May I know the reason why system didn't take Sto. Type with HU Type check during Sto. Type Search strategy?
Thank You,
Pavan
Hi Pavan,
Thats good that your issue is resolved, I hope when its resolved you can close the thread and ask further as much you can, but discipline will be your issue can be closed.
well explained by olet on your further que. I hope that is ans your que.
Also you HU type check does not related to POSC issue. as POSC is process and HU type check is putaway and HU in BIN.
And also if HU type check has to work then check Olet reply and check without POSC and then do with POSC from same product. you will understand the logic.
Regards
Suraj
Hello Pavan,
As your are using POSC don't you think system shall create HU WT task not Product WT ?
Please create :
Create HU Types
Assign HU Types to Storage Type
Assign consolidation group to Activity Area and Storage Type
Assign Hu Types for each storage bin type
Define Attributes for deconsolidation
Assign number ranges for consolidation groups
Also check with storage type,storage section,Bin Type search strategy.
Show me the work center layout .
BR,
Olet
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
9 | |
4 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.