on 11-18-2015 12:17 PM
Hi Expects
we had some issus with Sync job between SAP PO and SAP GRC, we sorted them by implementing following Notes:
SAP Note
2168872
2151938
2174744
2135925
2130253
2138367
2193637
2132329
2108402
1872047
2005901
2083046
2117294
2132541
2170568
On implementing above notes its working fine as expected in Developement system, and we moved changes to Quality system.
In Quality System the job GRAC_REPOSITORY_OBJECT_SYNC it is running successfully but the data is not getting updated completely in table GRACRLCONN.
we see only 17 entries in GRACRLCONN table, were as we have more then 100 roles in SAP PO system.
Thanks in Advance
Narender
Hi All,
Thanks all for your great contribution to fix this.
We noticed that when we do incremental synch, the data is getting updated gradually each time when we do incremental synch, but full synch is not performing as expected.
However as SAP PO is new system, we transported changes to Production, and it is working good in production.
I am really surprised to see such behavior.
I hpe we will have no oter such issues.
Thanks and regards,
Narender
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Have you checked this OSS note : 1840261 ?
or
Related fix
1889792 - UAM: Portal sync results in time out/ Portal Object not getting synched
2008685 - Portal sync in GRC 10.0 is not working
1940769 - Timeout problem in GRAC_REP_OBJ_SYNC
Thanks
KH
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi All,
The Dev roles are available in system, we have configured ROLE_SYNC_OBJ parameter as ROLE_ONLY, but still it’s fetching limited role details.
In addition when we did the same in development system it’s taking more then 17000+ seconds to complete the job [GRAC_REPOSITORY_OBJECT_SYNC] with full synch but in case of Quality system it’s just taking 27 Seconds every time we run, which is strange.
We are not sure where do we need to investigate and how to process.
Is there any buffer configuration or something like that which can limit the data or so on.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
HI Narender,
As Baithi said, please check the development roles are available in QA or not and run the Repository sync job in full sync mode.
With Regards
Trinadh Bokka
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Narender,
Have you run the repository object sync after PFCG Sync has completed successfully? PFCG Sync is required to be completed first.
Have you executed a FULL sync for repository object sync?
Though it's basic but at time we do overlook.
Thanks,
Priyanka
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello Narender,
As it is working in Dev system,then it should also work in Q system
check the below points
1.is your all implemented notes moved to Q system
2.Check connector access
3.Same Dev roles are existed in Q also,by chance if not transported
4.Check the parameter 1222 value in SPRO.
As Priyanka said,run please execute Role Repository Sync(GRAC_ROLEREP_ROLE_SYNC Program) in full mode.
Regards
Baithi
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.