SAP for Utilities Discussions
Connect with fellow SAP users to share best practices, troubleshoot challenges, and collaborate on building a sustainable energy future. Join the discussion.
cancel
Showing results for 
Search instead for 
Did you mean: 

Billing of interval meter demand meters with installation group

rupanjan
Member
0 Kudos

Dear SAP ISU Experts,

I am trying to bill interval demand meters with installation group.

The maximum peak demand is billed for secondary installations, but for billing the primary installation the maximum demand is billed after deducting the demand for each time slice.

In this scenario, data exchange between from secondary to primary is not supported as maximum demand for any register will occur at any point in time.

The maximum demand is calculated in RTP interface. But in this scenario the profiles of secondary installation cannot be allocated in primary installation as sub meters are no longer in primary installations.

Any help is welcome to solve this scenario.

Rick John

1 REPLY 1

Former Member
0 Kudos

Hi Rick John,

I wanted to understand your requirement clearly.

You have peak demand(1) from secondary meters which you would want to be deduct with the demand from primary meters falling in the same time. Say if peak demand of secondary meters was at 16:00 hrs on 11th Nov 2015, you want it deducted from demand of primary meter at 16:00 hrs of 11th Nov 2015. Correct ??

Can you explain with an example please.

Thanks,

Rakesh..

sapisurdg.wordpress.com