One material with posibility of two batch determination

Dear SAP experts,

I have one question for you. We want to have one HALB material manufactured in one facility, and second one want to purchase same material from external vendor.

I test it, is is possible. However, I´m facing problem with batch number. We have batch numbering different for external and for internal materials.

External batch is let say P1234 (P as purchased), internal batch has numbering C1234 (C as component).

I need to create new batch strategy, which will create batch number based on source of material. So basically in material master there will be I supposed new strategy, for specific component, which will create P or C lot based on source.

Can you please advice?

Thanks

Croacker Raven

Former Member