cancel
Showing results for 
Search instead for 
Did you mean: 

in mb1b in need to add same material's another line item

former_member695849
Discoverer
0 Kudos

Hi,

      When I do MB21  and give materials, for example I give 3 material numbers here and I save this document, and with this document reference I go to MB1B and I get the materials which I have given in MB21 and I give the batch number for each material, but my issue is if want to give 2 different batches for same material then how can I do this.

Thanks

Abdul

Accepted Solutions (1)

Accepted Solutions (1)

former_member185450
Active Contributor
0 Kudos

Hi Abdul,

if you are MB1B posting with reference to MB21 reservation means system will capture the line items which reservation is having

possibilities :

1. while creating reservation itself ensure and create two line items with different batches and make the MB1B against that reservation

2. if you created reservation with one line item means do the posting two times against that reservation using the two different batches

Regards,

Venkatesh..

former_member695849
Discoverer
0 Kudos

Thanks all. Issue resolved.

Regard's

Abdul

JL23
Active Contributor
0 Kudos

Moderator message: if that is the case then close the discussion please

Answers (2)

Answers (2)

Former Member
0 Kudos

create another new line item with different batch no

abumohammad_shoyeb
Participant
0 Kudos

Many information in SCN, please search before post

MB1C/MB1A you can use multiple batch for same material

Create separate lines for each batch for same material (enter batch Number in Batch field