Hi experts
what is the procedure to define BOM for a ring that is devided to some segments? How to define their unit of measure?
Thanks in advance
Hi,
Header Material : Segment 1 : Base Qty as 1 nos.
Item 0010 : Ring : Qty 1 nos
Item 0020 : Segment 2 : Qty as -1 or 1- nos.
Item 0030 : Segment 3 : Qty as -1 or 1- nos.
By do so, you are consuming ring and converting it to different segments. Like Dis-assmbling.
If suits mark as CORRECT and close the post. If not get back.
Thanks With Regards,
Dinesh V.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Dinesh
Thanks for reply, can you please explain more.
We want to use these segments in different stages of our product,
I'm confused by the unit of measure that can i define for the head (segment that is 1/16 ring) and unit of component ( ring that is a complete circle )
excuse me for bad writing
Thank you very much
B.R
Hi,
Pls share me the following details.
1. Ring (Main Part) : Assumed Based Qty as 1 XXX (fill UOM here).
2. Do you have same material no. for each segment or different (e.g., Segment = 16 nos or Segment 1 = 1 nos, Segment 2 = 1 kgs etc.,
3. What is actually means to say with head (segment that is 1/16 ring) ?
4. What problem you have with UOM ? Pls explain early with BOM e.g.,
Thanks With Regards,
Dinesh V.
Hi,
We have a main part with a material number and a child with other material number,
want to create a BOM by child part as a head and main part as component, the both unit of measure is each, actually there is a ring that is devide to 16 segments that these segments have the same material number and applied in different positions of product (Turbine).
if we set the segment as header the quantity of ring that used in it is equal to 1/16 ring, this is the problem i can't define this quantity and use it in production processes...
I hope this information be usefull,
Best regards
Hi,
If i understood ur case clear means, this is my suggestion:
In CS01 :
Header : Turbine - Base Qty 1 nos.
Item : 0010 - Segment - 16 nos.
Since you are talking about position use Sub-item as follows:
1. Select the item 0010 and
2. Choose Sub-item option in the screen. On the following screen describe you part location and qty.
NOTE: Sub-item is for information purpose only total of qty which you enter in sub-item screen will over-write ur item qty in CS01
If it is useful, MARK as HELP-FULL. If not get-back.
Thanks With Regards,
Dinesh V.
Hi,
but there are some questions?
1- for which materials (16 segments and a ring) we must create the inspection lot for guality inspection after production?
2- what's the procedure if in quality inspection some segments be rejected? another ring must be ordered from warehouse, what can we do with the excess segments that is produced in this way?
these are a part of our concerns,
thank you
B.R
Hi,
1. I General output materials'll have should under go QC plans. In your case Ring is consumable and Segments are the yield. So inspection lot is to be maintained for segments (DUMP-RULE).
2. If materials segments are rejected for e.g., out-off 16 segements 2 where rejected during inspection then u'll have a short-fall by 2 nos.
To Replace Reject Component do as follow:
SOLUTION 1:
Unplanned Goods Issue:-
With this type of withdrawal, it is determined during the production process that an additional material or an additional quantity of a component already withdrawn is required for an order. This withdrawal is unplanned because there is no reservation to be referenced. You enter this withdrawal as a goods issue without reference.
Entering Goods Issue Without Reference (Unplanned Goods Issue): -
Entering a goods receipt without referencing a document involves the following steps:
1. MIGO - Goods Issue > Others (Here use movement type "261")
2. Enter all details like; material, qty, plant, storage location, etc... IN YOUR CASE THIS IS RING.
3. In "Account Assignment" Tab enter "Production Order No"
Note: - If U select Goods Issue > Order and enter Order No and system defaults the materials and qty then its planned.
SOLUTION 2:
Production Order Without Material (CO07):
Here in settlement rule define you PREVIOUS PRODUCTION ORDER.
BOM add manually as i explained for main Prod Order.
The rest normal.
Expecting you feedback.
Thanks With Regards,
Dinesh Kumar V.
Hi,
I've created 3 materials and a BOM as seen in this image
I've created and released the production order,
I've received this error message when trying to perform a good receipt by migo,
I want to test if materials with serial numbers transfered, but when perfoming good receipt it didn't ask another segment's serial number.
any suggession would be very appreciated.
Thanks and Best Regards,
Hi Dinesh
Yes i maintained serial number profile in MM02 for Segments, for these Segments that are produced by a production order is important to have serial no.
Actually i wanted to test if the segments in components could be receive in warehouse to consume?
any suggestion...
Thank you very much
Hi,
I understood as that you have following two issues :
1. You can't able to Assign Serial No. for By-Product (Segment with negative sign in BOM). 2. Error message in MIGO.
Problem 1:
By-Product Posting is made during consumption only with movement type 531, that is during confirmation process. Bcz of that only you can't find that item line in your GR MIGO screen.
Check your confirmation screen on Goods Movement tab.
Also check MMBE for Segment-comp. and note for stock change/increase.
Problem 2:
If problem 1 is cleared, then use MB31 and mov. 101 for Production GR instead of using MIGO.
Pls get-back.
Thanks With Regards,
Dinesh V.
User | Count |
---|---|
85 | |
7 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.