Hello SAP Gurus,

We are encountering error in Posting Goods Issue.

Account 51020000 requires an assignment to CO Object.

This is a cost element. Standard cost of sales.

We already maintain it in OKB9 as profitability segment.

What else can we do to solve the error?

Thanks!

Athena

Accepted Solutions (0)

Answers (1)

Answers (1)

kamalkumar_biswas2
Active Contributor
0 Kudos

Hi Athena

You need not to make COGS a/c as CE  then it will ask a cost object.

  Kamal

Former Member
0 Kudos

Why COGS is not a cost element?

kamalkumar_biswas2
Active Contributor
0 Kudos

Hi

At the time of PGI it will post COGM to COGS a/c so basically it does not need a CE..if you create a CE cat 1 it will ask for CO object like CCtr etc.. What cat of CE you have created...

Kamal

Former Member
0 Kudos

Category 1 Primary costs/cost-reducing revenues

kamalkumar_biswas2
Active Contributor
0 Kudos

Hi Athena

In addition to my earlier one..more clearly you are assigning COGS in OBYC GBB-VAX as a BS a/c so no CE required because it is a transit a/c to move stock from Inventory to sales stock

But if your SO is a cost object the you are assigning GL a/c in GBB-VAY and in that case CE may rbe required...

So decide accordingly

Kamal

Former Member
0 Kudos

Yes when I checked OBYC, there is VAX for COGS.

Do I have to delete this? And maintain VAY instead?

former_member195434
Contributor
0 Kudos

Hi Athena,

Do not make COGS (GBB-VAX) as cost element. The reason for this is that in a manufacturing environment, the cost is incurred not at the point of sale but at the time of consumption (raw material, activities etc). Therefore, as far as controlling is concerned, the cost is already recognized in the production process. If you make COGS also as cost element, you are booking the cost twice, which is not correct.

Unless the sales order is a cost object (MTO) do not maintain GBB-VAY. For confirming whether sales order is MTO or not, check its requirement type.

Hope this clarifies.

BR

Abhi

kamalkumar_biswas2
Active Contributor
0 Kudos

Hi

If you want CE then assign in VAY for cost object like SO/WBS element etc if required

In normal scenario NO CE in VAX

Kamal

Former Member
0 Kudos

Hi Abhi,

Thanks. Very informative. So you mean I should removed the config of GBB VAX?

Former Member
0 Kudos

Hi Kamal!

I will maintain GBB VAY for this.

Thank you so much as always.

God Speed and More power!

XOXO,

Athena

kamalkumar_biswas2
Active Contributor
0 Kudos

Hi Athena

You are welcome...........

Pl close the thread

kamal

former_member195434
Contributor
0 Kudos

Hi Athena,

No I clearly don't mean that. What I mean is that you should first understand whether the scenario is MTO or MTS.

If it is MTO, then yes, remove from VAX and put it in VAY.

If it MTS, then removing from VAX and putting is VAY will not help. You must have VAX, but this account should not be a Cost element. You may have to create a new account (without CE) and put it in VAX.

Hope this helps

BR

Abhinav

Former Member
0 Kudos

We are in Made to Order scenario.

former_member195434
Contributor
0 Kudos

Hi Athena,

Does your sales order item reflect this ? (MTO)

Does it have a settlement rule?

If yes, then you must insert the Cost element COGS in GBB-VAY.

BR